ADF provides an organisation that is adapted to customer requirements and provides mechanical engineering services for rotary machines (repairs, damage analysis, …), metallurgical work especially requiring specialised qualifications, industrial cleaning, "high pressure" assemblies and the running of global contracts. Your expectations On "continuous flow" petro-chemical sites, which may be Seveso II classified, you expect from a general maintenance company:
- Complete control of Health, Safety and Environmental issues
- The guarantee that the production installations will be available
- The optimisation of maintenance costs
- Improvements made to the reliability of the equipment
- A response to activity peaks
- A pro-active approach to unforeseen events
| |
Our solutions ADF takes charge of the maintenance and servicing of the equipment included in the contract and controls sub-contracting to ensure maximum availability of the industrial means of its customers, whilst also containing costs: - Our organisation can adapt to requirements and takes into account the culture on site, based on the principles of standards such as ISO 9001 Quality Assurance, ISO 14001 Environmental and M.A.S.E Quality Reference.
- Carrying out maintenance work: stoppages, industrial cleaning, mechanical engineering on rotary machines
- Failure studies based on breakdown analyses and the drafting of maintenance modes and plans that are continuously updated
- The introduction of indicators to measure efficiency and transparent feedback processes
- Continuous performance improvement actions are conducted on out operating methods
- Functional analyses are incorporated into our CAMM system
References MM/IE maintenance contract - Etang de Berre petro-chemical site As part of fixed sum contracts with guaranteed results, we provide the mechanical engineering maintenance, metallurgical services, industrial cleaning, electrical work, instrumentation, analysis, and all related sub-contracted services. The installations require specialised expertise for the stoppage of steam cracker furnaces and for High pressure assemblies for the Polyethylene units (3 500 bars).
|